"/>

蜜臀av性久久久久|国产免费久久精品99|国产99久久久久久免费|成人精品一区二区三区在线|日韩精品一区二区av在线|国产亚洲欧美在线观看四区|色噜噜综合亚洲av中文无码|99久久久国产精品免费播放器

<cite id="ygcks"><center id="ygcks"></center></cite>
  • 
    
  • <rt id="ygcks"></rt>
    <cite id="ygcks"></cite>
  • <li id="ygcks"><source id="ygcks"></source></li> <button id="ygcks"></button>
  • <button id="ygcks"></button>
    <button id="ygcks"><input id="ygcks"></input></button>
    
    
    <abbr id="ygcks"><source id="ygcks"></source></abbr>
    
    
    Chinese engineering firm breaks through 2nd tunnel along China-Laos railway
    Source: Xinhua   2018-06-14 12:00:15

    VIENTIANE, June 14 (Xinhua) -- The China Railway Guangzhou Engineering Group (CREC Guangzhou) has broken through a second tunnel along the China-Laos railway, securing steady progress in the construction of the railway project.

    The CREC Guangzhou, a Chinese company which is in charge of the second section construction of the railway project, told Xinhua that the Ban Naven Tunnel was broken through on Tuesday.

    The Ban Naven Tunnel is located in the country's northern town of Muangxay, Oudomxay Province.

    The geological conditions of the 567-meter-long tunnel are very complicated with silty clay, sandstone and mudstone, thus posing challenges to the construction.

    Since June 6, 2017, the CREC Guangzhou has assigned outstanding staff to the hilly tropical area and applied advanced technology and equipment in the construction of the tunnel.

    The China-Laos railway is one of interconnectivity projects under the framework of the China-proposed Belt and Road Initiative. Construction of the railway began in December 2016 and is expected to open to traffic in December 2021.

    The China-Laos railway has a length over 414 km, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the railway is designed at 160 km per hour.

    Editor: Yurou
    Related News
    Xinhuanet

    Chinese engineering firm breaks through 2nd tunnel along China-Laos railway

    Source: Xinhua 2018-06-14 12:00:15
    [Editor: huaxia]

    VIENTIANE, June 14 (Xinhua) -- The China Railway Guangzhou Engineering Group (CREC Guangzhou) has broken through a second tunnel along the China-Laos railway, securing steady progress in the construction of the railway project.

    The CREC Guangzhou, a Chinese company which is in charge of the second section construction of the railway project, told Xinhua that the Ban Naven Tunnel was broken through on Tuesday.

    The Ban Naven Tunnel is located in the country's northern town of Muangxay, Oudomxay Province.

    The geological conditions of the 567-meter-long tunnel are very complicated with silty clay, sandstone and mudstone, thus posing challenges to the construction.

    Since June 6, 2017, the CREC Guangzhou has assigned outstanding staff to the hilly tropical area and applied advanced technology and equipment in the construction of the tunnel.

    The China-Laos railway is one of interconnectivity projects under the framework of the China-proposed Belt and Road Initiative. Construction of the railway began in December 2016 and is expected to open to traffic in December 2021.

    The China-Laos railway has a length over 414 km, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the railway is designed at 160 km per hour.

    [Editor: huaxia]
    010020070750000000000000011100001372532191
    江华| 行唐县| 泰和县| 思南县| 漳浦县| 静海县| 简阳市| 前郭尔| 禄丰县| 八宿县| 宽甸| 梓潼县| 福海县| 固镇县| 星子县| 小金县| 新兴县| 保定市| 榆林市| 漾濞| 霞浦县| 涞源县| 甘德县| 淮阳县| 二手房| 天祝| 乐清市| 巍山| 抚顺市| 双桥区| 孝昌县| 定日县| 应用必备| 鄂伦春自治旗| 马公市| 井冈山市| 高唐县| 和田市| 通化市| 鄂尔多斯市| 三穗县|