"/>

蜜臀av性久久久久|国产免费久久精品99|国产99久久久久久免费|成人精品一区二区三区在线|日韩精品一区二区av在线|国产亚洲欧美在线观看四区|色噜噜综合亚洲av中文无码|99久久久国产精品免费播放器

<cite id="ygcks"><center id="ygcks"></center></cite>
  • 
    
  • <rt id="ygcks"></rt>
    <cite id="ygcks"></cite>
  • <li id="ygcks"><source id="ygcks"></source></li> <button id="ygcks"></button>
  • <button id="ygcks"></button>
    <button id="ygcks"><input id="ygcks"></input></button>
    
    
    <abbr id="ygcks"><source id="ygcks"></source></abbr>
    
    
    Vietnam to spend 5.5 bln USD building 3 urban rail routes in capital
    Source: Xinhua   2018-04-10 13:49:14

    HANOI, April 10 (Xinhua) -- Vietnam's Hanoi authorities have proposed that the government instruct the early construction of three urban rail routes with total investment of 125,614 billion Vietnamese dong (over 5.5 billion U.S. dollars), Vietnam News Agency reported on Tuesday.

    The urban rail route No.2, which runs from Tran Hung Dao Street to Thuong Dinh Street, will go underground for nearly 6 km with a design speed of 80 km per hour, and be built from 2018 to 2024.

    The urban rail route No.5, which stretches from Van Cao Street to Hoa Lac area, will have a total length of 38.4 km with the speed of 90-120 km per hour, and become operational in 2025.

    The urban rail route No.3, which goes from Hanoi Railway Station to Hoang Mai district, will have a total length of 8.7 km, and be constructed in the 2018-2025 period.

    According to Hanoi's plan on developing transport till 2030 and with vision to 2050, the capital city will build a total of 10 urban rail routes with combined length of 417.8 km, including 75.5 km going underground, with total investment of nearly 40.1 billion U.S. dollars.

    Editor: ZX
    Related News
    Xinhuanet

    Vietnam to spend 5.5 bln USD building 3 urban rail routes in capital

    Source: Xinhua 2018-04-10 13:49:14
    [Editor: huaxia]

    HANOI, April 10 (Xinhua) -- Vietnam's Hanoi authorities have proposed that the government instruct the early construction of three urban rail routes with total investment of 125,614 billion Vietnamese dong (over 5.5 billion U.S. dollars), Vietnam News Agency reported on Tuesday.

    The urban rail route No.2, which runs from Tran Hung Dao Street to Thuong Dinh Street, will go underground for nearly 6 km with a design speed of 80 km per hour, and be built from 2018 to 2024.

    The urban rail route No.5, which stretches from Van Cao Street to Hoa Lac area, will have a total length of 38.4 km with the speed of 90-120 km per hour, and become operational in 2025.

    The urban rail route No.3, which goes from Hanoi Railway Station to Hoang Mai district, will have a total length of 8.7 km, and be constructed in the 2018-2025 period.

    According to Hanoi's plan on developing transport till 2030 and with vision to 2050, the capital city will build a total of 10 urban rail routes with combined length of 417.8 km, including 75.5 km going underground, with total investment of nearly 40.1 billion U.S. dollars.

    [Editor: huaxia]
    010020070750000000000000011100001371002181
    射洪县| 灌南县| 安福县| 无极县| 长宁县| 常宁市| 名山县| 建德市| 盐津县| 嘉峪关市| 社旗县| 太湖县| 崇仁县| 怀化市| 岳阳市| 黄大仙区| 色达县| 扬州市| 黄石市| 滨州市| 南京市| 库伦旗| 海南省| 岐山县| 松溪县| 台江县| 惠州市| 宜川县| 东乌珠穆沁旗| 营山县| 南阳市| 城步| 南开区| 舒城县| 固阳县| 永宁县| 方山县| 龙山县| 古交市| 武山县| 军事|