蜜臀av性久久久久|国产免费久久精品99|国产99久久久久久免费|成人精品一区二区三区在线|日韩精品一区二区av在线|国产亚洲欧美在线观看四区|色噜噜综合亚洲av中文无码|99久久久国产精品免费播放器

<cite id="ygcks"><center id="ygcks"></center></cite>
  • 
    
  • <rt id="ygcks"></rt>
    <cite id="ygcks"></cite>
  • <li id="ygcks"><source id="ygcks"></source></li> <button id="ygcks"></button>
  • <button id="ygcks"></button>
    <button id="ygcks"><input id="ygcks"></input></button>
    
    
    <abbr id="ygcks"><source id="ygcks"></source></abbr>
    
    
    Africa  

    China construction firms help Kenya team prepare for C' wealth Games

    Source: Xinhua   2018-02-22 16:59:33

    NAIROBI, Feb. 22 (Xinhua) -- Kenyan officials may be forced to ask Chinese construction companies working on renovation of stadiums in Nairobi and Eldoret to halt their work to allow athletes train for the Commonwealth Games.

    Barnaba Korir, Kenya's Chief de Mission to the Gold Coast Commonwealth Games, said on Thursday they have run into headwind as athletes lack suitable grounds to train prior to their departure to Australia on Mar. 24.

    "Nyayo Stadium is undergoing renovation and therefore unavailable entirely. While Kasarani Stadium warm up track is fine for training, the pitch is not conductive for field events training. Those two are in Nairobi. In Eldoret, Kipchoge Keino stadium is under renovation by Chinese-owned WIETC Company," he said.

    China has put in capital and human resources to bring up to world standard Kenya's stadium and though the work is continuing, local sports officials are demanding for time to train before the workers complete their renovations.

    WIETC Company was awarded the whole tender to construct the VIP pavilion, terraces, changing rooms and the parking lot in Elodret's Kipchoge Keino.

    Kenya track and field athletes, selected last week in Nairobi, will have to do with any available space to train and Korir hinted at pitching camp at the Kenyatta University grounds.

    "The other option is Kenyatta Stadium in Machakos, but they do not have hostels to accommodate the huge team of 80 we need to have in camp. The Kenya School of Monetary Studies hostels are good but we haven't talked to them," he added.

    The Commonwealth Games are set for April. 4-15 in Gold Coast, Australia. Kenya's first lot of athletes will leave Nairobi on March. 24 for Gold Coast while the marathon team will be the last to depart on April. 8.

    Due to challenges in acquisition of training grounds, Korir said the boxing team of 11 will camp in Nakuru, rugby players will shift to Mombasa, while the cycling team will be in Eldoret.

    "We have a challenge to determine where our athletes will be staying. Nyayo Stadium, Kipchoge Keino (Eldoret), Moi International Stadium Kasarani - are all under renovations," he said.

    Editor: Zhou Xin
    Related News
    Home >> Africa            
    Xinhuanet

    China construction firms help Kenya team prepare for C' wealth Games

    Source: Xinhua 2018-02-22 16:59:33

    NAIROBI, Feb. 22 (Xinhua) -- Kenyan officials may be forced to ask Chinese construction companies working on renovation of stadiums in Nairobi and Eldoret to halt their work to allow athletes train for the Commonwealth Games.

    Barnaba Korir, Kenya's Chief de Mission to the Gold Coast Commonwealth Games, said on Thursday they have run into headwind as athletes lack suitable grounds to train prior to their departure to Australia on Mar. 24.

    "Nyayo Stadium is undergoing renovation and therefore unavailable entirely. While Kasarani Stadium warm up track is fine for training, the pitch is not conductive for field events training. Those two are in Nairobi. In Eldoret, Kipchoge Keino stadium is under renovation by Chinese-owned WIETC Company," he said.

    China has put in capital and human resources to bring up to world standard Kenya's stadium and though the work is continuing, local sports officials are demanding for time to train before the workers complete their renovations.

    WIETC Company was awarded the whole tender to construct the VIP pavilion, terraces, changing rooms and the parking lot in Elodret's Kipchoge Keino.

    Kenya track and field athletes, selected last week in Nairobi, will have to do with any available space to train and Korir hinted at pitching camp at the Kenyatta University grounds.

    "The other option is Kenyatta Stadium in Machakos, but they do not have hostels to accommodate the huge team of 80 we need to have in camp. The Kenya School of Monetary Studies hostels are good but we haven't talked to them," he added.

    The Commonwealth Games are set for April. 4-15 in Gold Coast, Australia. Kenya's first lot of athletes will leave Nairobi on March. 24 for Gold Coast while the marathon team will be the last to depart on April. 8.

    Due to challenges in acquisition of training grounds, Korir said the boxing team of 11 will camp in Nakuru, rugby players will shift to Mombasa, while the cycling team will be in Eldoret.

    "We have a challenge to determine where our athletes will be staying. Nyayo Stadium, Kipchoge Keino (Eldoret), Moi International Stadium Kasarani - are all under renovations," he said.

    [Editor: huaxia]
    010020070750000000000000011100001369915731
    即墨市| 芜湖县| 鄂托克前旗| 兴业县| 南充市| 武威市| 安徽省| 柘荣县| 吴川市| 横山县| 汕头市| 新竹市| 县级市| 通榆县| 平远县| 新野县| 杂多县| 思茅市| 修文县| 舞阳县| 浦县| 旅游| 安新县| 建湖县| 凤翔县| 阜城县| 保德县| 江孜县| 富顺县| 建昌县| 武平县| 正镶白旗| 乌审旗| 怀柔区| 滁州市| 洛宁县| 鄱阳县| 屏东市| 调兵山市| 福安市| 娱乐|